Friday, December 16, 2005

Updated Pic's



Still got to finish the logic lights then the dome is complete.

Need to fix the utility arms in and fit the side vents.

LEGS that will be the next task I am going to wait until after christmas 05 before I start on them.

Centre Foot Wheel Assy


Trial fit of the centre foot wheel assembly,

Thursday, December 15, 2005

Centre Leg assembly


Centre leg assembled before any paint is applied.
Half moons are resin, foot is steel and the ankle is ali.

Friday, December 09, 2005

Middle Leg


Today my centre leg, ankle and cylinder's arrived

Monday, December 05, 2005

PSI


I have now installed my front PSI this will fade between blue and red.


Great news today Jerry Green has dispatched my centre leg assembly. Pics to come soon

HP's and Switches


Top view of the HP's and switches, as soon as the rest of the panels have hardened off I will attach them.

HP's Installed


Inner and outer dome now JB Welded together, installed the HP's and the two bump switches that I am using. All the panels have been sprayed and I am waiting for the laquer to dry completley befor I attach them back to the dome.

JB Welded the Dome


Took the plunge and JB Welded my inner and outer dome together, It took a lot of clamps and a steady hand to align it all up.
Lets hope it all works out.